RAHIMI, H., alizade, S. (2017). essence of price adjustment in construction contracts in iran and fidic. , 6(21), 147-175. doi: 10.22054/jplr.2018.8139
HABIB RAHIMI; saeede alizade. "essence of price adjustment in construction contracts in iran and fidic". , 6, 21, 2017, 147-175. doi: 10.22054/jplr.2018.8139
RAHIMI, H., alizade, S. (2017). 'essence of price adjustment in construction contracts in iran and fidic', , 6(21), pp. 147-175. doi: 10.22054/jplr.2018.8139
RAHIMI, H., alizade, S. essence of price adjustment in construction contracts in iran and fidic. , 2017; 6(21): 147-175. doi: 10.22054/jplr.2018.8139


login