Kabirfar, K. and Mojtahedi, M. (2019).The impact of [Engineering, Procurement and Construction (EPC) Phases on Project Performance. Buildings, Vol. 9 (1), 15 https://doi.org/10.3390/buildings9010015.
Martens, M.L. and Carvalho, M.M. (2017). Key factors of sustainability in project Management context: A survey exploring the project Managers’ perspective. Int. J. Proj. Manage, Vol. 35, pp. 1084-1102.
Joslin, R. and Müller, R. (2016). The relationship between project governance and project success. Int. J. Proj. Manage, Vol. 34, pp. 613-626.
Olanrewaju, A.L. and Abdul-Aziz, A.-R. (2015). Building maintenance processes, principles, procedures, practices and strategies Springer: Singapore, Building Maintenance Processes. DOI:10.1007/978-981-287-263-0-10
Oakland, J. and Marosszeky, M. (2017). Total Construction Management: Lean Quality in Construction Project Delivery Routledge. Abington, UK. ISBN 9781138908543, Published February 16, 2017 by Routledge, 634 Pages
Tommelein, I.D. (2015). Journey toward lean construction: Pursuing a paradigm shift in the aec industry. J. Construct. Eng. Manage, Vol.141, 04015005.
Edwin, H.W. (2006). Dispute resolution management for international construction Projects in China. Management Decision, Vol.7, pp.589-602.
Vidogah, W. and Ndekugri, I. (1997). Improving the management of claim. Contractors’ Perspective. Journal of Management in Engineering, OH University, Vol. 13, pp. 23-28.
Heravi.A. (2013). Cause of claims incidence in urban project contracts, MSc. Thesis. School of Civil Engineering, Science and Technology, Tehran, Iran.
Abrahimi, N. and Farahani, M. and Sheikh, J. (2015). Pathology of claim management process in design and Build contracts: the case study of oil contracts Sixth International Conference on Project Management, Istanboul, Turkey.
Chou, J.-S. Irawan, N. Pham, A.-D. Project Management knowledge of construction professionals: Cross-country study of effects on project success. J. Construct. Eng. Manage. 2013, 139, 04013015.
Demirkesen, S. and Ozorhon, B. (2017). Impact of integration Management on construction project Management efficiency. J. Proj. Manage, Vol. 35, pp.1639-1654.
Zeng, S. and Ma, H. and Lin, H. Zeng, R. and Tam, V.W. (2004). Social responsibility of major infrastructure projects in china.Int. J. Proj. Manage, Vol.33, pp. 537-548.
Mubarak, S.A. (2015). Construction Project Scheduling and Control John Wiley & Sons: Hoboken, NJ, USA,
Pophalie, M. (2011). Causes of cost overrun in construction. IOSR J. Eng., Vol.4, pp.1-7.
Lin and Hsu, M. (2003). Fuzzy assessment model to estimate the probability of delay in Turkish construction projects. J. Manage. Eng., Vol.31, 04014055.
Ma, A.A. (2016). Exploring delay causes of road construction projects in Egypt. Alex. Eng. J., Vol. 55, pp.1515-1539.
Lu and Liu, R. (2018 a). acute toxicity bioassay of mercuric chloride: an alien fish from a river. Toxicological & Environmental Chemistry. Vol.92, pp.169-173.
Julong Deng, JD. (2000). Business Dynamics: Systems Thinking and Modeling for a Complex world, McGraw-Hill, NewYork, US.
Davis, K. A. (2016). method to measure success dimensions relating to individual stakeholder groups. Int. J. Proj. Manag., Vol. 34, pp. 480-493.