1. Ahmad, M.M., Dhafr, N. (2002). Establishing and improving
manufacturing performance measures. Robotics and Computer Integrated
Manufacturing, 18 (3), 171-176.
2. Alias, M.A., Hashim, S.Z., Samsudin, S. (2009). Using fuzzy analytic
hierarchy process for southern Johor river ranking, Int .J. Advance Soft
Comput, 1 (1), 62-76.
3. Arteta, B.M., Giachetti, R.E. (2004). A measure of agility as the
complexity of the enterprise system. Robotics and Computer-Integrated,
20, 495-503.
4. Azadeh, A., Ghaderi, S.F., Partovi, Y., Ebrahimipour, V., Suzuki, K.
(2007). An integrated framework for continuous assessment and
improvement of manufacturing systems. Applied Mathematics and
Computation, 186, 1216-1233.
5. Carlsson, C., Fuller, R., Heikkila, M., Majlender, P. (2007). A fuzzy
approach to R&D project portfolio selection. International Journal of
Approximate Reasoning, 44, 93-105.
6. Chang, S., Shen, H. (2002). Supply chain reengineering using a core
process analysis matrix and object oriented simulation. Information &
Management, 39, 345-358.
7. Chen, C.C. (2008). An objective-oriented and product-line-based
manufacturing performance measurement. Int .J. Production Economics,
112, 380-390.
8. Cheng, M., Tsai, H., Lai, Y. (2009). Construction management process
reengineering performance measurements. Automation In Construction,
18, 183-193.
9. Davenport, T.H., Short, J.E. (1990). The new industrial engineering:
Information technology and business process redesign. Sloan
Management Review 31 (4), 11–27.
10.Davenport, T.H. (1993). Process Innovation: Reengineering Work
Through Information Technology. Harvard Business School Press,
Boston.
11.Gingele, J., Childe, S.J., Miles, M.(2002). A modeling technique to
reengineering business process controlled by ISO 9001. Computers in
industry, 49, 235-251.
12.Hammer, M. (1990). Reengineering work: Don’t automate, obliterate.
Harvard Business Review, 104–112.
13.Hammer, M., Champy, J. (1993). Reengineering the Corporation: A
Manifesto for Business Revolution. Harper Business, New York.
14.Herzog, N.V., Tonchia, S., Polajnar, A. (2009). Linkages between
manufacturing strategy, benchmarking, performance measurement and
business process reengineering. Computers & Industrial Engineering.
15.Hipkin, I.B., Cock, C.D. (2000). TQM and BPR: lessons for maintenance
management. Omega, 28, 277-292.
16.Kim, S.H., Jang, K.J. (2002). Designing performance analysis and IDEF0
for enterprise modeling in BPR. Int .J. Production Economics, 76, 121-
133.
17.Klapka, J., Pinos, P. (2002). Decision support system for multicriterial
R&D and information systems project selection. European Journal of
Operational Research, 140, 434-446.
18.Lee, J.W., Kim, S.H. (2000). Using analytic network process and goal
programming for interdependent information system project selection.
Computers and Operations Research, 27, 367-382.
19.Lin, C., Hsieh, P.J. (2004). A fuzzy decision support system for strategic
portfolio management. Decision Support Systems, 38, 383-398.
20.Ma, N., Wang, L. (2006). An integrated study of global competitiveness
at firm level: based on the data of china. In Proceedings of PICMET.
21.Mavrotas, G., Diakoulaki, D., Kourentzi, A. (2008). Selection among
ranked projects under segmentation, policy and logical constraints.
European Journal of Operational Research, 187, 177-192.
22.Meixner, O. (2009). Fuzzy AHP group decision analysis and its
application for the evaluation of energy sources. Institute of Marketing
and Innovation. Vienna, Austria.
23.O’Neill, P., Sohal, A. (1999). Business process reengineering: A review
of recent literature. Technovation, 19, 571-581.
24.Ozcelik, Y. (2010). Do business process reengineering projects payoff?
Evidence from the United States. International Journal of Project
Management, 28, 7-13.
25.Reijers, .H.A., Mansar, S.L. (2005). Best practices in business process
redesign: an overview and qualitative evaluation of successful redesign
heuristics. Omega, 33, 283-306.
26.Tatsiopoulos, I.P., Panayiotou, N. (2000). The integration of activity
based costing and enterprise modeling for reengineering purposes. Int .J.
Production Economics, 66, 33-44.
27.Torabi, S.A, Hassini, E. (2008). An interactive possibilistic programming
approach for multiple objective supply chain master planning. Fuzzy Sets
and Systems, 159, 193-214.
28.Tseng, F.M., Chiu, Y.J., Chen, J.S. (2009). Measuring business
performance in high-tech manufacturing industry: A case study of
Taiwan’s large-sized TFT-LCD panel companies. Omega, 37, 686-697.
29.Whitman, M. (1996). IT divergence in reengineering support:
performance expectations VS. Information and management, 39, 313-
324.
30.Yu, C.S., Li, H.L. (2001). An Algorithm for generalized fuzzy binary
linear programming problem. European Journal of Operational Research,
133, 496-511.