عطافر، علی.، اقبالی، محمد.) 7260 (. آسیب شناسی عوامل مؤثر بر تأخیر در پروژه های منطقة 2
- . عملیات انتقال گاز ایران. مجله مدیریت صنعتی دانشگاه تهران، سال پنجم، شماره دوم، 720 84
Abdul-Rahman, H., Takim, R., & Min, W. S. (2009). Financial-related causes contributing to project delays. Journal of Retail & Leisure Property, 8(3), 225-238.
Al-Hazim, N. (2015). Delay and cost overrun in road construction projects in Jordan. International Journal of Engineering & Technology, 4(2), 288-293.
Assaf, S. A., & Al-Hejji, S. (2006). Causes of delay in large construction projects. International journal of project management, 24(4), 349-357.
Azadeh, A., Ziaei, B., & Moghaddam, M. (2012). A hybrid fuzzy regression-fuzzy cognitive map algorithm for forecasting and optimization of housing market fluctuations. Expert Systems with Applications, 39(1), 298-315.
Baghery, M., Yousefi, S., & Rezaee, M. J. (2016). Risk measurement and prioritization of auto parts manufacturing processes based on process failure analysis, interval data envelopment analysis and grey relational analysis. Journal of Intelligent Manufacturing, DOI: 10.1007/s10845-016-1214-1.
Chen, C. B., & Klein, C. M. (1997). A simple approach to ranking a group of aggregated fuzzy utilities. IEEE Transactions on Systems, Man, and Cybernetics, Part B (Cybernetics), 27(1), 26-35.
Chen, Y. C., Chiu, Y. H., Huang, C. W., & Tu, C. H. (2013). The analysis of bank business performance and market risk—Applying Fuzzy DEA. Economic Modelling, 32, 225-232.
Doloi, H., Sawhney, A., Iyer, K. C., & Rentala, S. (2012). Analysing factors affecting delays in Indian construction projects. International Journal of Project Management, 30(4), 479-489.
Doraisamy, S. V., Akasah, Z. A., & Yunus, R. (2015). An Overview on the Issue of Delay in the Construction Industry. In InCIEC 2014, Springer Singapore, 313-319.
Fallahnejad, M. H. (2013). Delay causes in Iran gas pipeline projects. International Journal of Project Management, 31(1), 136-146.
Hu, X., & Liu, C. (2015). Managing undesirable outputs in the Australian construction industry using Data Envelopment Analysis models. Journal of Cleaner Production, 101, 148-157.
Hwang, S. N., Chen, C., Chen, Y., Lee, H. S., & Shen, P. D. (2013). Sustainable design performance evaluation with applications in the automobile industry: Focusing on inefficiency by undesirable factors. Omega, 41(3), 553-558.
Kaliba, C., Muya, M., & Mumba, K. (2009). Cost escalation and schedule delays in road construction projects in Zambia. International Journal of Project Management, 27(5), 522-531.
Kim, S. Y., & Tuan, K. N. (2016). Delay factor analysis for hospital projects in Vietnam. KSCE Journal of Civil Engineering, 20(2), 519-529.
Kosko, B. (1986). Fuzzy cognitive maps. International Journal of man-machine studies, 24(1), 65-75.
Kyriakarakos, G., Patlitzianas, K., Damasiotis, M., & Papastefanakis, D. (2014). A fuzzy cognitive maps decision support system for renewables local planning. Renewable and Sustainable Energy Reviews, 39, 209-222.
Lee, K. C., Lee, H., Lee, N., & Lim, J. (2013). An agent-based fuzzy cognitive map approach to the strategic marketing planning for industrial firms. Industrial Marketing Management, 42(4), 552-563.
Lovell, C. K., & Pastor, J. T. (1999). Radial DEA models without inputs or without outputs. European Journal of Operational Research, 118(1), 46-51.
Papageorgiou, E. I., & Kannappan, A. (2012). Fuzzy cognitive map ensemble learning paradigm to solve classification problems: Application to autism identification. Applied Soft Computing, 12(12), 3798-3809.
Papageorgiou, E. I., Stylios, C., & Groumpos, P. P. (2006). Unsupervised learning techniques for fine-tuning fuzzy cognitive map causal links. International Journal of Human-Computer Studies, 64(8), 727-743.
Rezaee, M. J., Izadbakhsh, H., & Yousefi, S. (2016). An improvement approach based on DEA-game theory for comparison of operational and spatial efficiencies in urban transportation systems. KSCE Journal of Civil Engineering, 20(4), 1526-1531.
Rezaee, M. J., Yousefi, S., & Hayati, J. (2016). A decision system using fuzzy cognitive map and multi-group data envelopment analysis to estimate hospitals’ outputs level. Neural Computing and Applications, DOI: 10.1007/s00521-016-2478-2.
Sacchelli, S., & Fabbrizzi, S. (2015). Minimisation of uncertainty in decision-making processes using optimised probabilistic Fuzzy Cognitive Maps: A case study for a rural sector. Socio-Economic Planning Sciences, 52, 31-40.
Sambasivan, M., & Soon, Y. W. (2007). Causes and effects of delays in Malaysian construction industry. International Journal of project management, 25(5), 517-526.
Shafiee, M., Lotfi, F. H., & Saleh, H. (2014). Supply chain performance evaluation with data envelopment analysis and balanced scorecard approach. Applied Mathematical Modelling, 38(21), 5092-5112.
Shivambu, X., & Thwala, W. D. (2014). The causes of delays in the delivery of construction projects: a review of literature. In Proceedings of the 17th International Symposium on Advancement of Construction Management and Real Estate, Springer Berlin Heidelberg, 715-720.
Storn, R., & Price, K. (1997). Differential evolution–a simple and efficient heuristic for global optimization over continuous spaces. Journal of global optimization, 11(4), 341-359.
Sweis, G., Sweis, R., Hammad, A. A., & Shboul, A. (2008). Delays in construction projects: The case of Jordan. International Journal of Project Management, 26(6), 665-674.
Tone, K. (2001). A slacks-based measure of efficiency in data envelopment analysis. European journal of operational research, 130(3), 498-509.
Wanke, P., Barros, C. P., & Emrouznejad, A. (2016). Assessing productive efficiency of banks using integrated Fuzzy-DEA and bootstrapping: A case of Mozambican banks. European Journal of Operational Research, 249(1), 378-389.
Yang, J. B., & Wei, P. R. (2010). Causes of delay in the planning and design phases for construction projects. Journal of Architectural Engineering, 16(2), 80-83.
Zimmermann, H. J. (1975). Description and optimization of fuzzy system. International Journal of General System, 2(1), 209-215.