Cheng, J., Fowler, J., Kempf, K., (2012) Simulation-based multi-mode resource-constrained project scheduling of semiconductor equipment installation and qualification, Proceedings of the Winter Simulation Conference, 1-12.
Garcia, C., (2016) Resource-constrained scheduling with hard due windows and rejection penalties, Engineering optimization, 48(9), 1515-1528.
Naderi, B., N. Salmasi, (2012) Permutation flowshops in group scheduling with sequence-dependent setup times, European Journal of Industrial Engineering, 6(2), 177-199.
Pinedo, M.L. (2008) Theory, algorithms, and systems, 3rd edn. Springer Science+Business Media, New York.
Stafford, E.F., F.T. Tseng, J.N.D. Gupta, (2005) Comparative evaluation of MILP flowshop models, Journal of Operational Research Society, 56, 88–101.
Tseng, F.T., E.F. Stafford, (2008) New MILP models for the permutation flowshop problem, Journal of the Operational Research Society, 59, 1373–1386.
Wang, L., C. Fang, (2011) An effective shuffled frog-leaping algorithm for multi-mode resource-constrained project scheduling problem, Information Sciences, 181(20), 4804-4822.
|